Film 1 12 mins |
Building 41 - Architects and blueprints. Digging out the
ground for the Building 41 basement. Installing concrete
foundations for the steel pillars. Steel framework
arising. Concrete basement walls being poured.
Steel rectangular tubing being installed on the roof. |
Film 2 6 mins |
Building 41 - Roof being tarred, a layer of insulation
panels laid, more tar, a sheet of waterproof tar paper,
more tar and sand on top. Bricklaying in the winter.
More steelwork going up. Scan of the finished front of
Building 41. Completed Building 41 lounge. |
Film 3 15 mins |
Building 41 - Adding insulation panels. Laying concrete block.
Adding ceiling support ductwork and panels. Installing
terrazo floor. Building the concourse road entrances. Installing steel girders to support the south mezzanine.
Unloading a large steel support girder from a railcar
inside Building 41. Attaching the large UPJOHN letters to the
front of the building. Installing heated sidewalks.
Pouring concrete walls for the tunnel to the power
house. |
Film 4 12 mins |
Building 41 - Temporary roofing and scaffolding. Crane lifting
large girders. More girders being put into place. Rebar in the floors. Finished exterior
brickwork. Adding stone trim to the exterior. Sealing
joints in large steel pipes. Installing stone coping at
the roof level.
Small crane laying on its side. Welding rectangular
steel stock together on the roof. Closing off the
central mezzanine. |
Film 5 2 mins |
Barn Fire - Fire departments tackling a barn fire on Upjohn
property in Portage. Multiple fire trucks. Likely this was a
controlled burn. |
Film 6 5 mins |
St. Louis Distribution Center
- Steel beam and concrete block construction.
Panoramic view of the building while under construction. |
Film 7 12 mins |
Cortin Building
- Laying thr foundations. Crane
moving tubs of concrete to work site. Railroad spur into the site.
Unloading lumber from railroad cars. Erecting steel
beams and girders. Welding of beams
and girders. Unloading and stacking bricks by hand. Laying bricks.
Laying concrete floor. Scaffolding for bricklayers on
the front of the building. Tarring the roof. Delivering and
installing reactors. |
Film 8 18 mins |
Water Tower - Concrete foundations being poured.
Metal panels being delivered and installed. Seams being
welded and smoothed. Tower being painted. |
Film 9 26 mins |
Power House - Blowing up old foundations with
dynamite. Unloading girders from train car. Installing
boilers. Installing a lot of pipework. Temporary
boilerhouse. Welding girders. Adding heat exchangers.
Steel framework completed. Installing rebar and
underfloor condoit. Installing coal bunker. Laying
exterior brickwork. Finished exterior. Crane being used
to install the chimneys. Testing boilers. Finished
building. Adding heating tubes under the Building 41 concourse road.
Shot of parking lot. |
Film 10 7 mins |
Waste Treatment Plant
- Unloading girder from railroad car. Adding crushed stone
into the waste treatment filtration tank. Steel pipes
for carrying waste. Loading crushed stone into boxes for
dumping in the filter. Uloading stone from railroad car.
Upjohn Co railroad switcher in action. |
Film 11 6 mins |
Temporary Power House
- Early panoramic shot of the site. Laying foundations.
Unloading boilers and steelwork. Installing boilers
(Note - these boilers came from decommissioned WWII navy
ships). Adding exterior walls of corrugated asbestos.
Tarring the roof. Building 38 steelwork going up in the
background. |
Film 12 8 mins |
Water and Waste
Pipework - Moving large diameter corrugated steel
pipes. Drilling water wells. Excavating and laying black
iron pipe. Installing large diameter corrugated pipe
in a trench. |
Film 13 6 mins |
Waste Treatment Plant
- Aerial footage of the site. Finished waster water
treatment plant. Lengthy explanation with diagrams of
the waste treatment process. Tanker truck loading sludge
for disposal elsewhere, probably on farm fields. |
Film 14 12 mins |
Waste Treatment Plant
- Making a sand filter, Finishing stonework on the
building. Building the filtration tank. Installing the
hollow floor in the filtration tank. Adding crushed rock
to the filtration tank. Culvert where the clean water
was released. Panoramic footage of the finished waster
treatment plant. |
Film 15 13 mins |
Misc - Drilling
water well. Practising fire fighting with the new Upjohn Company
fire truck. Building 41 sidewalks and concourse access
road being finished. Building 41 parking lot before the
asphalt was laid. Small building behind the temporary
power house being constructed. Aerial footage of the
site. Laying concrete curbing along Portage Road.
Installing the flagpole in front of Building 41.
Compacting subgrade and laying asphalt on internal
roads. |
Film 16 14 mins |
Site Preparation
- Blowing up trees with dynamite. Clearing the site.
Concrete pipe being laid in a trench. Railroad car full
of ballest being distibuted along the Upjohn spur track
underneath it. Aerial view of the site. Blowing up old
concrete foundations with dynamite. Grader working.
Installing drains. Mechanical shovel excavating a
basement. Framing for the Building 38 basement. Steel frame
for one of the three construction sheds going up.
Excavating. Aerial view of the site. Makeshift shelter.
The 3 construction sheds finished. Drilling and flushing
a large diameter water well. Laying asphalt. Mixing
concrete. Employees playing croquet and softball on
the finished lawn. Finished parking lot. Unloading top dirt.
|
Film 17 10 mins |
Utilities
- Upjohn railroad switcher arriving on a railroad flat
car. Switcher being unloaded on a homemade ramp.
Switcher being tested on the Upjohn spur. Concrete
tunnels for underground utilities. Rebar being installed
in a floor. Waterproofing tunnel sides with tar. Upjohn
executives riding in the railroad switcher. Site
electrical substation being installed. Large
transformer arriving. Lifting and ballasting the railroad spur.
Installing concrete and black iron pipe in a trench.
Installing a fire hydrant. Installing 6ft diamemter
concrete pipe in a trench. |
Film 18 5 mins |
Utlities
- 6 ft concrete pipes being installed and joints being
sealed in a deep trench. Ceramic brown pipe being
installed and joints sealed in a trench. Aerial footage
of the site with only Building 38 and the temporary
power house built. |