These photos are all taken in Downtown Kalamazoo 
					except the last two. Construction on 
					the Portage site did not begin until 1946 and it was fully 
					operational by 1951. All the equipment 
					in these photos would have been made in-house by the Upjohn 
					Engineering Department.