In materials loaned to me by Julie Pylatt I discovered a binder documenting a demolition project undertaken by Upjohn in 1953/54 at their Downtown Kalamazoo complex. The Portage manufacturing site was in full operation by this time so the buildings demolished were no longer needed. These are the sections in the binder: | |
Site Photos | Buildings 2 and 3 |
Buildings 12, 5 and 4 | Buildings 12, 13 and 17 |
Building 15-1 | Building 20 and 25 |
Buildings 36 and 37 | Buildings in 1960 |
Loraine Pschigoda took photos of the demolition of the Upjohn Downtown Kalamazoo Power Plant in the 1980s. | |