Downtown Demolition Project 1953-54  

   Return to Upjohn Memories Home Page  

 

In materials loaned to me by Julie Pylatt I discovered a binder documenting a demolition project undertaken by Upjohn in 1953/54 at their Downtown Kalamazoo complex. The Portage manufacturing site was in full operation by this time so the buildings demolished were no longer needed. These are the sections in the binder:
Site Photos Buildings 2 and 3
Buildings 12, 5 and 4 Buildings 12, 13 and 17
Building 15-1 Building 20 and 25
Buildings 36 and 37 Buildings in 1960
   

   Return to Upjohn Memories Home Page